One plan. A clear handover.
Coordinate the complete scope
Agree the display, supporting equipment and structural work needed for the project.
Connect delivery stages
Follow the project from site preparation and installation through trial operation and acceptance.
Hand over with your team
Confirm the agreed records, equipment handover and routine maintenance instruction.
Defined around the project
Turnkey work follows the confirmed contract and site conditions. The responsibilities for structures, utilities and other contractors are agreed before execution.
Structural scope
Steel structure design, fabrication and installation where included in the agreed project scope.
Display and equipment installation
Installation of the display body, distribution box and control equipment covered by the project.
Project coordination
Coordinate site preparation, interfaces and the agreed installation activities.
System commissioning
Commission the system and carry out trial operation and agreed acceptance activities.
Handover and instruction
Provide the agreed project handover records and instruction on routine maintenance precautions.
From preparation to project handover
Define the requirement
Share the display information, site location, project conditions and intended installation.
Confirm scope and readiness
Agree the project plan, structural and utility interfaces, responsibilities, dates and quotation.
Deliver and commission
Carry out the agreed installation and commissioning work, with trial operation and project coordination.
Accept and hand over
Complete the agreed acceptance, customer instruction and equipment handover records.
Before your visit
- Confirm the structure, utilities, access, site readiness and interfaces with other contractors.
- Specify which materials, civil works, permits, transport and additional activities are included in the contract.
- Agree the installation and commissioning plan, acceptance criteria, training and handover records.
At project handover
- Agreed installation and commissioning — Work completed within the confirmed turnkey project scope.
- Acceptance and handover records — Project-specific acceptance documentation and agreed equipment handover records.
- Routine maintenance instruction — Practical instruction and the agreed training confirmation for the customer team.
Good to know
Does turnkey mean every site cost is automatically included?
No. The contract defines the included work, materials and interfaces. Civil works, utilities, permits, transport and other activities must be expressly agreed.
Can structural work be included?
Yes, steel structure design, fabrication and installation may form part of the agreed turnkey scope. The required structural work and responsibilities are confirmed for the project.
What is handed over?
The confirmed scope includes agreed installation and commissioning work, trial operation, acceptance and routine maintenance instruction. Project records are specified during scope confirmation.
How do I obtain a quotation?
Provide the screen area, installation environment, pixel pitch and site location, along with any project notes. The team will review the requirement before confirming the plan and quotation.