商品情報にスキップ
AbsenCare LED Display Turnkey Service product hero

LEDディスプレイのターンキーサービス

$0.00

Bring the installation work, system commissioning and project handover into one agreed plan. Turnkey Project Service coordinates the confirmed display, supporting equipment and structural scope with your project team.

Your project

Tell us about your display to prepare the service brief

We’ll review your requirements before confirming scope and scheduling

Turnkey ProjectQuotation after reviewing your requirements

YOUR SERVICE INQUIRY

Discuss your turnkey project

Review your requirements and leave your contact details. Our team will confirm the service scope and quotation.

By submitting, you acknowledge our privacy policy. This is an inquiry, not a confirmed booking.

Shipping & delivery

Delivery options and final availability are confirmed during checkout.

Service & support

Contact our team for configuration, installation and service guidance.

One plan. A clear handover.

Coordinate the complete scope

Agree the display, supporting equipment and structural work needed for the project.

Connect delivery stages

Follow the project from site preparation and installation through trial operation and acceptance.

Hand over with your team

Confirm the agreed records, equipment handover and routine maintenance instruction.

Defined around the project

Turnkey work follows the confirmed contract and site conditions. The responsibilities for structures, utilities and other contractors are agreed before execution.

Illustration of a standard Absen service working area
Standard-work illustration; actual project arrangements follow the agreed scope
  1. Structural scope

    Steel structure design, fabrication and installation where included in the agreed project scope.

  2. Display and equipment installation

    Installation of the display body, distribution box and control equipment covered by the project.

  3. Project coordination

    Coordinate site preparation, interfaces and the agreed installation activities.

  4. System commissioning

    Commission the system and carry out trial operation and agreed acceptance activities.

  5. Handover and instruction

    Provide the agreed project handover records and instruction on routine maintenance precautions.

From preparation to project handover

  1. Define the requirement

    Share the display information, site location, project conditions and intended installation.

  2. Confirm scope and readiness

    Agree the project plan, structural and utility interfaces, responsibilities, dates and quotation.

  3. Deliver and commission

    Carry out the agreed installation and commissioning work, with trial operation and project coordination.

  4. Accept and hand over

    Complete the agreed acceptance, customer instruction and equipment handover records.

Before your visit

  • Confirm the structure, utilities, access, site readiness and interfaces with other contractors.
  • Specify which materials, civil works, permits, transport and additional activities are included in the contract.
  • Agree the installation and commissioning plan, acceptance criteria, training and handover records.

At project handover

  • Agreed installation and commissioning — Work completed within the confirmed turnkey project scope.
  • Acceptance and handover records — Project-specific acceptance documentation and agreed equipment handover records.
  • Routine maintenance instruction — Practical instruction and the agreed training confirmation for the customer team.

Good to know

Does turnkey mean every site cost is automatically included?

No. The contract defines the included work, materials and interfaces. Civil works, utilities, permits, transport and other activities must be expressly agreed.

Can structural work be included?

Yes, steel structure design, fabrication and installation may form part of the agreed turnkey scope. The required structural work and responsibilities are confirmed for the project.

What is handed over?

The confirmed scope includes agreed installation and commissioning work, trial operation, acceptance and routine maintenance instruction. Project records are specified during scope confirmation.

How do I obtain a quotation?

Provide the screen area, installation environment, pixel pitch and site location, along with any project notes. The team will review the requirement before confirming the plan and quotation.