Move the display. Plan the next installation.
Connect both sites
Coordinate dismantling and transport with the destination installation requirements.
Prepare the new location
Agree the destination structure, site interfaces and reinstallation work for the existing display.
Check operation after the move
Commission the reinstalled display and review it through the agreed acceptance process.
A relocation plan for the existing screen
For projects such as a store or exhibition-hall relocation, confirm the display condition and the responsibilities at both sites.
Original-site dismantling
Dismantle the existing display according to the confirmed relocation plan.
Transport coordination
Arrange the transportation activities included in the agreed relocation scope.
Destination structure
Fabrication of a new steel structure for the destination installation where agreed for the project.
Display reinstallation
Reinstall the existing display at the confirmed destination site.
Commissioning and acceptance
Commission the reinstalled display and complete the agreed acceptance activities.
Maintenance instruction
Provide instruction on routine maintenance precautions for continued use.
From the current site to the next
Describe the move
Share screen details, the original and destination sites, and the reason for the relocation.
Confirm the relocation plan
Agree display condition, dismantling, transport, structural scope, access, responsibilities and quotation.
Move and reinstall
Carry out the agreed dismantling, transportation and destination installation activities.
Commission and hand over
Review operation at the new site, complete the agreed acceptance and provide maintenance instruction.
Before your visit
- Provide the locations and access conditions for both the original and destination sites.
- Confirm display condition, packing, lifting, transport, insurance and freight responsibilities and charges.
- Agree destination structural work, utilities, reinstallation requirements, acceptance and scheduling.
At the new site
- Relocated installation — The existing display reinstalled at the destination within the agreed relocation scope.
- Commissioning and acceptance — Review the commissioning results and agreed acceptance activities after reinstallation.
- Routine maintenance instruction — Instruction on precautions for continued use and maintenance of the display.
Good to know
Does relocation include a new steel structure?
A new destination structure can be included where agreed for the relocation project. Its design requirements, fabrication and installation responsibilities must be confirmed in the project scope.
Are all transport and lifting charges included?
No blanket inclusion is assumed. Packing, transport, freight, insurance, lifting and access arrangements and costs must be specified in the quotation.
Can any existing display be relocated?
The team must review the display condition and the requirements at both sites before confirming the available relocation scope.
What information should I include in the notes?
Include the original and destination locations, access conditions, desired schedule and any known display issues or changes to the installation.