跳到商品資訊
AbsenCare Display Relocation Service product hero

顯示屏搬遷服務

Price on request

Plan the dismantling, transport and reinstallation of an existing LED display. The relocation scope connects the original site with the destination, including agreed structural work, commissioning, acceptance and routine-maintenance instruction.

Your project

Tell us about your display to prepare the service brief

We’ll review your requirements before confirming scope and scheduling

Display RelocationQuotation after reviewing your requirements

YOUR SERVICE INQUIRY

Plan your display relocation

Review your requirements and leave your contact details. Our team will confirm the service scope and quotation.

By submitting, you acknowledge our privacy policy. This is an inquiry, not a confirmed booking.

Pricing is confirmed after reviewing your project requirements.

Contact for quote
Shipping & delivery

Delivery options and final availability are confirmed during checkout.

Service & support

Contact our team for configuration, installation and service guidance.

Move the display. Plan the next installation.

Connect both sites

Coordinate dismantling and transport with the destination installation requirements.

Prepare the new location

Agree the destination structure, site interfaces and reinstallation work for the existing display.

Check operation after the move

Commission the reinstalled display and review it through the agreed acceptance process.

A relocation plan for the existing screen

For projects such as a store or exhibition-hall relocation, confirm the display condition and the responsibilities at both sites.

  1. Original-site dismantling

    Dismantle the existing display according to the confirmed relocation plan.

  2. Transport coordination

    Arrange the transportation activities included in the agreed relocation scope.

  3. Destination structure

    Fabrication of a new steel structure for the destination installation where agreed for the project.

  4. Display reinstallation

    Reinstall the existing display at the confirmed destination site.

  5. Commissioning and acceptance

    Commission the reinstalled display and complete the agreed acceptance activities.

  6. Maintenance instruction

    Provide instruction on routine maintenance precautions for continued use.

From the current site to the next

  1. Describe the move

    Share screen details, the original and destination sites, and the reason for the relocation.

  2. Confirm the relocation plan

    Agree display condition, dismantling, transport, structural scope, access, responsibilities and quotation.

  3. Move and reinstall

    Carry out the agreed dismantling, transportation and destination installation activities.

  4. Commission and hand over

    Review operation at the new site, complete the agreed acceptance and provide maintenance instruction.

Before your visit

  • Provide the locations and access conditions for both the original and destination sites.
  • Confirm display condition, packing, lifting, transport, insurance and freight responsibilities and charges.
  • Agree destination structural work, utilities, reinstallation requirements, acceptance and scheduling.

At the new site

  • Relocated installation — The existing display reinstalled at the destination within the agreed relocation scope.
  • Commissioning and acceptance — Review the commissioning results and agreed acceptance activities after reinstallation.
  • Routine maintenance instruction — Instruction on precautions for continued use and maintenance of the display.

Good to know

Does relocation include a new steel structure?

A new destination structure can be included where agreed for the relocation project. Its design requirements, fabrication and installation responsibilities must be confirmed in the project scope.

Are all transport and lifting charges included?

No blanket inclusion is assumed. Packing, transport, freight, insurance, lifting and access arrangements and costs must be specified in the quotation.

Can any existing display be relocated?

The team must review the display condition and the requirements at both sites before confirming the available relocation scope.

What information should I include in the notes?

Include the original and destination locations, access conditions, desired schedule and any known display issues or changes to the installation.